Iteration 6 prepares the first pilot (FSD §21). Its exit is the MVP exit of PRD Phase 1: one team uses Zettra daily for a month. This kit lists what to set up, how to run the usability sessions, what to watch, and when the pilot counts as passed.
Before day one¶
- [ ] Server: sized with hardware.md and installed with operations.md.
- [ ] HTTPS: with the customer's certificate, or Caddy's internal CA trusted on the team's machines.
- [ ] AI mode: chosen with the team's IT: local (a GPU for the recommended tier), bring-your-own-key with the acknowledgement signed off, or off.
- [ ] Exit check for the chosen model: run
app eval --seedon the pilot server (FSD §11.8). Record precision, recall, abstention and the median latency. - [ ] Load test: run
deploy/loadtest/run.sh 100000on a scratch install of the same hardware, then remove the scratch install. - [ ] Backups: run a first backup from Admin → Backups, then a restore drill into a scratch stack. Show IT where
/backupsis and agree who copies it off the server. - [ ] Accounts: the team's users are created, with project roles and client scopes; each person has opened their setup link.
- [ ] Registry: the module tree is built for the pilot project (§7): modules, menus, client-specific menus, aliases.
- [ ] History: 20–50 recent requests are entered as tickets, with reasons and closing decisions, so Ask has history to answer from.
- [ ] Feedback: a channel exists, such as a chat group or a weekly call, and one named person on each side.
Usability sessions¶
Run three 45-minute sessions in the first two weeks, one person each (a PM, a developer, a support lead). Sit beside them, give each task as written, and do not help unless they are stuck for two minutes.
Note for each task: - whether it was done; - the time it took; - where they hesitated; - what they said, in their words.
| # | Task (PRD story) | Done when |
|---|---|---|
| 1 | "A client just called about overtime approval. Log their request." (story 3) | A ticket exists with client, requester, menu and reason |
| 2 | "Find out why overtime approval skips the supervisor for Client A." (story 1) | They open the menu's page, or ask, and name the ticket behind it |
| 3 | "Ask Zettra the same question in your own words." (story 2) | They read an answer and open a cited ticket, or see "Not enough information" and know what to try next |
| 4 | "The request is done. Close it." | The close dialog is filled and the decision record is confirmed |
| 5 | "Move a menu to the module where it belongs." | It is moved by dragging or with the parent picker |
| 6 | (Admin) "Check that last night's backup ran." | They find the time and size in Admin → Backups |
Afterwards, ask: - What did you expect that did not happen? - What would stop you using this every day? - On a scale of 1 to 5, how much do you trust Ask's answers, and why?
What to watch during the month¶
- Admin → Ask log: the not-enough-information rate, answers slower than 30 seconds, and the questions nobody could answer. These point to missing history or menu aliases.
- Admin → System status: disk use, failed jobs, the model server.
- Tickets:
- the share linked to a menu (target 90%) and the share with a filled reason (target 85%);
- weak reasons, such as "client request", to coach.
- Daily use: someone on the team creates, updates or asks at least once each working day.
Exit¶
The pilot passes when, over one month: - the team uses Zettra on at least 18 of about 22 working days; - the success metrics in FSD §15.5 are at or near their targets, measured from the database; - the team wants to keep it.